MASCI Operations Platform
MASCI
Operations Platform
Today's report

Nine short steps. Dropdowns first. AI drafts the story of this shift from your field records. Save state, scope, and next action stay visible the whole time.

DraftAutosave on
Project not selected2026-10-29623395Draft

Step 1 · Where were we?

Project & Conditions

Tap Use My Location or enter a verified location.
Weather not captured yet
Tap Use My Location to refresh weather from verified coordinates.
Step 2 · Who was there?

Crew, Equipment & Subcontractors

MASCI Crew

No MASCI crew today.

Equipment

No equipment today.

Subcontractors & Vendors

No subcontractors or vendors on site today.

Step 3 · What got done?

Work Performed & Production

Production rows
Sta from
Sta
Field quantity tracking

Assigned project cost codes appear here so crews can log today's installed quantity against bid quantity.

0 assigned rows · 0 with entries

No assigned project cost codes yet. PM job setup will populate this section.

Optional — speak instead of typing

Voice to report

Hold the mic, speak in any language, and I’ll add English text to Work Performed or Activities.

Approved work blocks (draft — for PM review)

approved work blocks

The system will preserve today's field entries and build approved work blocks from production, cost-code quantities, crews, equipment, materials, and constraints without replacing the Daily Report.

Draft blocks: 0
Enter production, a cost-code quantity, or report-level resources to build the approved work blocks.
Step 4 · What moved?

Materials & Tickets

Motive site activity review

Choose a job and report date to review site activity.

Materials delivered
Hauled off / outbound
Step 5 · What can we prove?

Photos & Evidence

0/6 required

Add at least 6 more photos before submit.

Attachments & document evidence

Upload delivery tickets, quantity spreadsheets, CEI notes, or other supporting files.

0 files

PDFs, Excel (.xlsx /.xls /.xlsm), CSV, Word (.doc /.docx), and text files up to 25 MB each.

Step 6 · What impacted today?

Delays, Extra Work & Safety

Did anything reduce or add to production today?
Did anything safety-related occur today?
Visitors on site(optional — inspectors, owners, subs' PMs)

No outside visitors logged.

Excavation / Trench Operations
Complete this section only when excavation or trench work occurred today.
Excavation today?
No excavation work today. This section stays clean.
Step 7 · What's next?

Tomorrow & PM Attention

Step 8 · Shift story draft

AI Shift Story

AI analyzes the photos, weather, crew, production, notes, and every report detail to draft the story of this shift. Approve it, regenerate it, or reject AI and write your own before submit.

AI Shift Story Draft

More information needed

Grounded in the full shift record you entered — photos, weather, crew, production, blockers, and notes. Before submit, accept the AI shift story, regenerate and accept it, or reject AI and approve a manual version.

Submission is blocked until one approved shift story exists.
No photos attached yet.
Missing report details
  • project identification
  • work location
  • superintendent or preparer
  • weather conditions
  • work performed or production quantities
  • crew or subcontractor labor
  • photo evidence
  • tomorrow plan or follow-up

Add activities, crew, or notes to see a draft summary here.

Step 9 · Sign & submit

Submit Readiness & Sign-Off

Still needed Project · Location · Location source · Prepared By · 6 photos · Approved Shift Story · Signature

Sign with your finger, stylus, or mouse above the line.

Operational form · MASCI platform