Step 1 · Where were we?
Project & Conditions
Crew, Equipment & Subcontractors
No MASCI crew today.
No equipment today.
No subcontractors or vendors on site today.
Work Performed & Production
Assigned project cost codes appear here so crews can log today's installed quantity against bid quantity.
0 assigned rows · 0 with entries
No assigned project cost codes yet. PM job setup will populate this section.
Optional — speak instead of typing
Hold the mic, speak in any language, and I’ll add English text to Work Performed or Activities.
Approved work blocks (draft — for PM review)
The system will preserve today's field entries and build approved work blocks from production, cost-code quantities, crews, equipment, materials, and constraints without replacing the Daily Report.
Materials & Tickets
Motive site activity review
Choose a job and report date to review site activity.
Photos & Evidence
Add at least 6 more photos before submit.
Upload delivery tickets, quantity spreadsheets, CEI notes, or other supporting files.
PDFs, Excel (.xlsx /.xls /.xlsm), CSV, Word (.doc /.docx), and text files up to 25 MB each.
Delays, Extra Work & Safety
No outside visitors logged.
Tomorrow & PM Attention
AI Shift Story
AI analyzes the photos, weather, crew, production, notes, and every report detail to draft the story of this shift. Approve it, regenerate it, or reject AI and write your own before submit.
AI Shift Story Draft
Grounded in the full shift record you entered — photos, weather, crew, production, blockers, and notes. Before submit, accept the AI shift story, regenerate and accept it, or reject AI and approve a manual version.
- project identification
- work location
- superintendent or preparer
- weather conditions
- work performed or production quantities
- crew or subcontractor labor
- photo evidence
- tomorrow plan or follow-up
Add activities, crew, or notes to see a draft summary here.
Submit Readiness & Sign-Off
Sign with your finger, stylus, or mouse above the line.
