The platform thinks first. You verify. Compliance is calculated live — only the sections that apply to your trench will appear below.
Live OSHA Status
Needs Review
Workable — Safety will follow up on the highlighted items.
1 review
Suggested protective system: Needs Safety Review (soil not classified)
- Soil not classified yetThe protective system depends on soil type. A competent person must classify it before entry.→ Pick a soil type or leave 'Unknown / Needs Review' so Safety follows up.
Stop-Work Authority. If anything looks wrong, stop the job. You will never be punished for keeping a crew alive.
Coaching, not punishment. Flags mean Safety will follow up — not that you did anything wrong.
1 · MASCI Job · Project Information
Same job source as Daily Reports.
Unscheduled, life-safety, utility-strike, water-main break, or after-hours excavation. Yes routes this to the Superintendent's Emergency chip immediately.
1b · Field Leadership Roster
Pull from the certified MASCI roster — no manual typing.
2 · Excavation Dimensions
3 · Work Type
4 · Soil / Ground ConditionsSmart Trigger
5 · Protective System
6 · Assigned Trench Safety Assets
Multi-select from the certified MASCI trench registry. Status / serial / open holds shown.
9 · Spoils / Edge Protection
12 · Competent Person
13 · Photos
Required photo kinds — capture each before crew descent.
- Overall ExcavationRequired
- Protective SystemRequired
- Access/EgressRequired
- Utility MarkingsRequired
- Soil ConditionOptional
- Water ConditionOptional
- Traffic ControlOptional
Upload photos after submission via the asset photo workflow on the success page.
14 · Field Notes
Original Language: EN
Competent Person Required. Every trench 5 ft or deeper needs a designated competent person on-site — trained to identify hazards, authorized to correct them, and present before crews enter. No competent person, no entry.